Drop a Primavera P6 .xer export and get one consolidated schedule-quality and project-controls audit — parsed entirely in your browser.
STDP1 + DCMA-14
MODECLIENT-SIDE
▼
Drop your .XER file here, or click to browse
Exported from Primavera P6 · single project or multi-project files supported
● File is parsed locally — nothing is uploaded
Project Controls Intelligence · Phase 1
Schedule Health & Action Center
Go beyond pass/fail: understand where schedule quality is weak, which areas need attention, and what should be reviewed before submission.
Phase 1 Control Coverage
Phase 1 adds project-controls diagnostics to the single Overall Schedule Health score above. These are findings and control indicators, not a second score.
Top Schedule Problems
Prioritized by schedule-control impact, not simply by issue count.
One consolidated report: Overall Schedule Health + DCMA 14-Point Assessment + all Phase 1 Project Controls findings.
Dashboard · DCMA 14-Point Assessment
Measured Value vs. Threshold
Percentage-based checks (points 1–11) · click any bar to open that point's detail below
DCMA Status
Assessment status only — not a second score
Category Mix
Relationship vs. activity-based checks
Index & Count-Based Checks
Points 12–14 use different units (index / raw count), so each is shown on its own scale against its target · click to open detail
Configurable DCMA thresholds
Adjust the pass/fail threshold used for each check to match your contract's schedule specification. This does not change how each metric is measured — only the bar it's compared against.